Project

Logan Fast Rail Site Office

Twenty glazed frames for a two-storey project office in Beenleigh.

The Package

A site office, glazed like a permanent one

This is the project office for the Logan and Gold Coast Faster Rail upgrade at 11 Logan River Road, Beenleigh. It is not a station. Surefit supplied and installed all the glazing across both floors: eight external window wall units and twelve internal fixed screens.

The external units are 3000mm wide in three bays, each with a fixed highlight, framed in Ezi 100mm Commerce flushline. The internal screens to the meeting rooms and offices sit in a 27mm glazing channel. All frames are finished in Duratec Zeus Black Matt. The window wall carries a WERS certificate (Uw 2.5, SHGC 0.38) for Section J.

Location 11 Logan River Road, Beenleigh
Scope Supply and install of 8 external window wall units and 12 internal glazed screens over two levels
Sizes Window and door sizes are nominal only and are to be verified on site prior to manufacture
Elevations All frames are as viewed from outside
Elevations All frames are as viewed from outside
Finish Duratec zeus black matt
Framing Ezial 100x500mm flushline framing, Ezial 27mm glazing channel
Glass All glass to code as1288-2006
Sealants Polyurethane Sika Pro ZHP
Standards AS 1288, AS 2047, NCC Section J
Logan Fast Rail

Related Projects

Projects that sit inside the scope

Every project named, with the builder and the value. Builders can check any of them.

Similar package?

Send us your project.

Drawings, spec and programme to our estimating team. Priced scope back. No lump sums, no consultations.